Skip to Content
GrantDeliverable Checklist — End of Project

Deliverable Checklist — End of Project

Source: grant/deliverable-checklist.md · synced 2026-06-12

What must exist by 30 Dec 2026 for the claim to succeed by 29 Jun 2027.


Functional / Code Deliverables

Modules (per Annex 3)

  • AI-Powered Resourcing — candidate + employer scraping, enrichment, tagging
  • AI Candidate Filtering & Matching — JD parser, rubric engine, scoring, shortlist
  • AI-Driven Candidate Outreach — personalisation, sequences, send, response handling

Productisation surface

  • Public marketing landing page live
  • Pricing page with tiers
  • Signup flow → email verification → onboarding wizard
  • Login + Supabase Auth working
  • Stripe (test mode) checkout integrated end-to-end
  • Tenant management admin dashboard
  • At least 1–2 demo tenants seeded with realistic data
  • Calibre tenant in active daily use

Multi-tenancy proof

  • RLS policies enforced on every tenant-scoped table
  • Manual test: log in as Calibre, see Calibre data only; log in as Demo Agency, see only its data
  • Tenant config UI (verticals, rubrics, tone, branding)

Documentation Deliverables (Annex 3 explicit)

  • Project report on Calibre letterhead covering:
    • Final completed product/prototype description with screenshots/links
    • All 3 modules described with feature-level detail
    • Project progress narrative
    • Challenges encountered + how addressed
    • Productivity achieved (before/after table with REAL measured numbers)
    • Future growth plans
  • Training materials:
    • Slide decks (one per module + an overview deck)
    • Written SOPs for each major workflow
    • Video recordings of training sessions
  • Training attendance record:
    • Spreadsheet with date, attendee names, topic, duration

Productivity Measurement (for project report)

  • Pre-build baseline captured (before any go-live)
    • Candidates sourced / recruiter / week
    • Time-to-shortlist (days)
    • Outreach volume / week
    • Response rate
  • Post-build measurement window: Oct–Dec 2026
  • Before/after table populated in project report

Financial / Compliance Deliverables

  • 3NMP invoice for S$28,000 issued and paid by Calibre via bank transfer
  • Audit firm engaged from EnterpriseSG Panel of Auditors (Calibre’s responsibility)
  • Claim form completed in Business Grant Portal (BGP) by Calibre
  • Audit Report issued by panel auditor to EnterpriseSG and Calibre
  • All supporting documents in English (invoices, bank statements)
  • Documents retained for 5 years post-completion

Optional / Strengthens Audit Position

  • At least one inbound signup from a real headhunting agency on the public surface (even if they don’t convert) — proves the marketing claim
  • LinkedIn post / press release announcing the product launch
  • Testimonial from Calibre about productivity gains
  • One-pager pitch deck for selling to other agencies
  • Domain registered, DNS verified, SSL active

Audit-Day Demo Script (draft)

When the auditor visits / requests demo:

  1. Open public productisation domain (TBD — was getcalibre.ai, abandoned 2026-06-04) — show marketing, pricing
  2. Click signup → walk through onboarding wizard with throwaway agency name
  3. Show new tenant in admin dashboard
  4. Log in as Calibre → show real recruiter workflow (resourcing → match → outreach)
  5. Log in as Demo Agency → show different data, same UI
  6. Show Stripe customer portal with active test subscription
  7. Show RLS policies in Supabase dashboard
  8. Walk through codebase highlights: rubric engine, scoring algo, vertical templates
  9. Show training materials + attendance log

Failure Modes (avoid)

  • Claim submitted with only screenshots → auditor wants live system
  • “Marketable to other agencies” claim with no real productisation surface
  • Productivity numbers in report are estimates, not measured
  • No training records / attendance log
  • Late panel auditor engagement → blows past 29 Jun 2027 claim deadline
  • Cash payment from Calibre to 3NMP (banned by Annex 1.7)
  • Side arrangement that triggers Annex 1.12
Last updated on